- lots of cleaning and the removal of some old netting and other items from previous owners
- port rail scraped, sanded and sealed with 3 coats of Cetol
- starboard rail scraped, sanded and sealed with 2 coats of Cetol
- 2 rails above the cabin, the teak above the transom and the hatch cover scraped, sanded and sealed with 3 coats of Cetol
- combing scraped
- new flag made and hung
- old marine head removed and through-hull sealed
- new portable head installed
- old curtains removed
- door by the head removed
- new drawer pull hangers for curtains sealed with 2 coats of Cetol and installed (there were 25)
- new curtains sewn
- anchor brace installed
- new tigerwood dodger blocks fabricated and sealed with 1 coat of Cetol
- some interior trim cleaned and sealed with 2 coats of Cetol
- electrical wring traced, excess wiring removed, some wiring recapped and taped
- solar battery charger installed
- solar deck light installed
- new screws for stanchions
- replace some interior screws with brass screws
- new windex installed